Installation of subway line of 4.2 km with XLPE cable 800 mm2 per phase in the network.installation of 6 junction chambers along the entire route.excavation of 12,240 m3 in the entire transmission line SET San Juan – SET Chorrillos (Districts of San Juan de Miraflores and Chorrillos).