Installation of the Huachipa Industrial Complex substation at 60kV

Information

  • Client: Gloria
  • Date: Apr 2015 - Sep 2015
  • Location: SJL

Installation of the Substation of the Huachipa Industrial Complex at 60kV – San Juan de Lurigancho

New Electrical Connection Point for the Huachipa Complex with the interconnection to the SEIN (National Interconnected Electrical System) in 60/22.9kV – San Juan de Lurigancho